Military Registrar  Military Attire  WWII Forums
Advanced Search      
Register Home Portal Blog Links Mark Forums Read
Go Back   Military Forum > Military Forums: General Discussion > Armed Forces Discussions > Army Forums > Armor
User Name
Password
Blogging

Reply
 
LinkBack Thread Tools Display Modes
Old 02-28-2006, 08:16 AM   #1 (permalink)
USMC Moderator

Semper Fi!
MSgt USMC Ret

 
USMCRET6391's Avatar
 
Group:
Lieutenant General

USMCRET6391Marine is USMCRET6391 isimli üyemiz çevrimdışıdır. (Offline)
AKA: Top
Join Date: Aug 2004
Location: San Diego
Posts: 9,545
Threads: 3537
UserID: 69
User Info
United_States  marine_corps  male  taurus  

My current mood: Happy
Reputation +/-Power: 16
Points: 276
USMCRET6391 is a jewel in the roughUSMCRET6391 is a jewel in the roughUSMCRET6391 is a jewel in the rough
USMCRET6391Marine is USMCRET6391 isimli üyemiz çevrimdışıdır. (Offline)  

I Infantrymen Army Slashes Abrams, Bradley Funding

InsideDefense.com NewsStand | Jason Sherman | February 28, 2006

Eleventh hour cuts to the Army's portion of the fiscal year 2006 supplemental spending request stripped billions of dollars for key improvements to Abrams tanks and Bradley fighting vehicles, setting back service plans to modernize the force and threatening to break assembly lines that upgrade these front-line combat systems, according to Pentagon documents and industry officials.

Last-minute efforts by the Office of the Secretary of Defense to trim the Pentagon's supplemental request down to $65.3 billion in mid-February forced the Army to slash more than $2 billion from its combat tracked vehicle lines, according to Pentagon officials.

Army officials are now looking to the next “bridge supplemental” spending request -- which could come as soon as the fall -- to restore those funds, according to Pentagon documents.

But that may be too late to avoid an eight-month production break in the Abrams tank industrial base and cause severe disruptions in the Bradley line, driving up costs for the armored personnel carriers by as much as 50 percent, according to Pentagon documents and industry officials.

More than $1.2 billion was wrung from the Abrams tank line last week in the budget maneuver, sending shock waves through the tank industrial base and service modernization plans. This cut would delay fielding modernized tanks to both the active component and National Guard and push off engine improvements necessary for Iraqi urban operations, according to Pentagon documents.

The Army is looking to streamline by 2013 its fleet of Abrams tanks down to two types: the M1A2 System Enhancement Program (SEP) for the active force and the M1A1 Abrams Integrated Management (AIM) program for the National Guard.

That schedule may be reconsidered, industry officials said, in the wake of the recent cuts, which include: $588 million to produce 120 M1A2 SEP tanks for two enhanced brigade combat teams; $504 million for 210 M1A1AIM tanks for three brigade combat teams in the National Guard; and $155 million for the Tank Urban Survivability Kit that was to be purchased this year and fielded to units in Iraq next year.

The Bradley M2A3 program took a $1 billion hit, which will delay fielding the most advanced versions of the armored personnel carriers to three heavy brigade combat teams in the 1st Armed Division that are being transformed into modular units. The A3 variant of the Bradley has increased protection and is more survivable than older versions of the vehicle.

A key experimental Army unit that was slated to receive the A3 Bradleys will not receive them, according to Pentagon documents.

Without funds sought in the supplemental, Army effective Brady production plans could be derailed and upend the services' procurement strategy, driving up the unit cost of each vehicle by as much as 50 percent, according to Pentagon documents that detail the impact of the cuts.

Other combat tracked vehicle programs were also cut.

The M88A2 Hercules, designed to tow a disabled Abrams tank and other heavy tracked vehicles, had $331 million cut from the supplemental that were intended to completely outfit two heavy brigade combat teams. The cut will delay fielding of these vehicles by as many as three years, Pentagon documents state.

The M113 Family of Vehicles funding line also was cut by $90 million, which will affect improvements slated for 172 of the vehicles, including upgrades to the A3 variant of the M1068, M1064, M113 and M577, according to the Pentagon documents. A delay for these upgrade efforts will slow down by as many as two years transformation efforts of two active duty brigade combat teams at Fort Bliss and three National Guard brigade combat teams. The industrial base assembly line that support these upgrades will run out of work in fiscal year 2007.

-Top


USMCRET6391's Sig:





The truth of the matter is that you always know the right thing to do. The hard part is doing it.
USMCRET6391 isimli üyemiz çevrimdışıdır. (Offline)  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote

Sponsored Links

» Support the Site!

Military Gear - Domain Names - Military Ltd Gear - Infantrymen Gear - Ranger Gear - Single Servicemen
Reply



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


New To The Site? Need Information?

 

Powered by vBulletin® Version 3.7.1
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd., SEO by vBSEO 3.1.0
Designed by MilitaryDesign.Com
MilitaryLtd.com, GoInfantry.Com, Infantrymen.Net, Infantrymen's Military Forum are © 2000-2008 MilitaryLtd.Com. All Rights Reserved.
Any copying, redistribution or retransmission of any of the contents or images without express written consent is expressly prohibited.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251